加入收藏 设为首页 企业邮箱
昆山展奥体育设施工程
全国服务热线
 138 6264 3063
0512-3686 8426
展奥新闻
联系展奥

电话:0512-3686 8426
手机:13862643063
联系人:刘小姐
邮箱:info@kszaty.com
地址:昆山市花桥镇外青淞公路988号

展奥新闻
在夏季施工塑胶场地时应注意的几点事项
关键词: 展奥体育设施    发表时间:2016-06-22    浏览量:1515    来源:昆山展奥
在夏季施工塑胶场地时应注意以下几方面事项。
In the following aspects should be paid attention to
when summer construction plastic
field.
塑胶球场施工中非常怕水,在胶浆固化前哪怕一滴汗水滴落在上面都会产生明显的气泡,因此在夏季场地施工时避免中午下午等时段施工,准备擦汗的毛巾防止汗珠滴落在场地上。
The most afraid of water in plastic stadium construction, even a drop of sweat
dripping before mucilage curing above would have obvious bubbles, so during the
summer period of construction, such as venue construction to avoid when noon
afternoon ready to wipe the sweat towel to prevent sweat dripping presence on
the ground.
夏季较多雷雨天气,因此一定要提前掌握天气状况并做好相应的防止降雨的应急措施,在湿度较大的环境中不宜施工。
More summer thunderstorm weather, so be sure to grasp the weather conditions in
advance and make the corresponding emergency measures to prevent rain, in the
larger environment humidity shoulds not be
construction.
防止胶面铺筑后发生局部起泡脱壳情况,严格控制基层密实度,防止水泥基础嵌挤不实而脱壳脱层,致使胶面被拉断。基层密实度不够的地方可采用钻头打孔以及灌胶的方式对其加固。
Prevent the rubber surface paving after local blister shell, strict control of
grassroots compactness, prevent cement based embedded crowded untrue and shell
layer, the adhesive surface is pulled. Grassroots compactness not enough place
to adopt the way of drill holes and glue on its reinforcement.
展奥首页 关于展奥 展奥产品 展奥工程 展奥售后 展奥新闻 联系展奥
电话:0512-3686 8426 手机:138 6264 3063 联系人:刘小姐 邮箱:info@kszaty.com 地址:昆山市花桥镇外青淞公路988号 分享:
在线咨询
点击这里给我发消息
点击这里给我发消息